This twin-station setup for coil wrapping was recently installed at a Spartan Steel production facility in the US. Once the wrapping of the first coil is completed, the robots will switch over to wrap the coil loaded in the other cell behind them. This MultiWrapper should be able to keep up even at peak production times!
The MultiWrapper streamlines your packaging process with automated stretch wrapping and a twin-station setup for extra high throughput.
– Designed for excellent uptime and low maintenance.
– Ready for smart manufacturing (Industry 4.0)
See the full wrapping cycle (approx. 4 minutes) in the time-lapse video: